Posts

Showing posts with the label C-Tools RFP Outline

RFP Geo thermal Ground Loop (HVAC)

Request for Proposal: Data Needed Verticle/Horizontal/Manifold Bore Hole Depth Loop Runs Spacing between Cold Hot Loop Bore Hole Size Pipe Size Bore Hole Spacing Packing material Pipe Material Recirculating Pump Maintenance Cycle to incude costs & Freq. Product Replacement Schedule Component Replacement Schedule (10/50%) Warranty Ratio Heat Pump Air Handler Factors: X Sq Ft = 1 Ton of Air I Ton of Air = Dollars Installed System Tonage Capacity

RFP Propeller Wind Generation

RFP Ouline Min WSPG Max Rated Windspeed Pivotable? Cost per installed Watt Size\ Cost per Unit Watts per unit Maintenance Cycle to include costs & Freq. Product Replacement Schedule Component Replacement Schedule (10/50%) Warranty Ratio Cost Assc. with Inverter if Req

RFP Verticle Wind Generation

RFP Outline Min WSPG Max Rated Windspeed Pivotable? Cost per installed Watt Size Maintenance Cycle to incude costs & Freq. Product Replacement Schedule Component Replacement Schedule (10/50%) Warranty Ratio Cost Assc. with Inverter if Req

RFP Horizontal Wind Turbin

RFP Outline Min WSPG Max Rated Windspeed Pivotable? Cost per installed Watt\ Size Maintenance Cycle to incude costs & Freq. Product Replacement Schedule Component Replacement Schedule Warranty Ratio Cost Assc. with Inverter if Req