Joint implementation Projects (JI) Under Kyoto

Joint implementation (JI) is one of three flexibility mechanisms set forth in the Kyoto Protocol to help countries with binding greenhouse gas emissions targets (so-called Annex I countries) meet their obligations. JI is set forth in Article 6 of the Kyoto Protocol.[1]

Under Article 6, any Annex I country can invest in emission reduction projects (referred to as "Joint Implementation Projects") in any other Annex I country as an alternative to reducing emissions domestically. In this way countries can lower the costs of complying with their Kyoto targets by investing in greenhouse gas reductions in an Annex I country where reductions are cheaper, and then applying the credit for those reductions towards their commitment goal.

A JI project might involve, for example, replacing a coal-fired power plant with a more efficient combined heat and power plant. Most JI projects are expected to take place in so-called "economies in transition," noted in Annex B of the Kyoto Protocol.[2] Currently Russia and Ukraine are slated to host the greatest number of JI projects.[3]

Unlike the case of the Clean Development Mechanism, the JI has caused less concern of spurious emission reductions, as the JI, unlike the CDM, takes place in countries which have an emission reduction requirement.

The process of receiving credit for JI projects is somewhat complex.
  • Emission reductions are awarded credits called Emission Reduction Units (ERUs), where one ERU represents an emission reduction equaling one tonne of CO2 equivalent.
  • The ERUs come from the host country's pool of assigned emissions credits, known as Assigned Amount Units, or AAUs.
  • Each Annex I party has a predetermined amount of AAUs, calculated on the basis of its 1990 greenhouse gas emission levels.
  • By requiring JI credits to come from a host country's pool of AAUs, the Kyoto Protocol ensures that the total amount of emissions credits among Annex I parties does not change for the duration of the Kyoto Protocol's first commitment period.

The Rest @ Wikipedia

Comments

Popular posts from this blog

Loans to Small Bunsinesses Opening Up

CFC Solutions GMBH now MTU Onsite Energy GmbH

TXU and Solar City Partner bring PV Leasing to Texas