Capstone Turbine Corporation

21211 Nordhoff Street
Chatsworth, CA 91311
818-734-5300
1-866-4-CAPSTONE

Manufacutres:

Their distributor Geographic Region Texas
GDI Integration Systems

Business Focus
Oil & Resource Recovery

Business PartnerDistributor
Contact Address4606 FM 1960 Rd. West Suite# 555Houston Texas 77069 USA
Phone(281)583-1134
Fax(832)466-3914

Emailmsierra@generaldetectors.com

Geographic RegionTexas (East of Highway 277)
AboutFive Star Electric is a Texas Based Company providing world-class technical solutions and services to customers by manufacturing and representing electrical power conversion, motors, automation, and control products and parts.
Business Focus
Business PartnerDistributor
Contact
Address4729 Shavano OakSan Antonio Texas 78249 USA
Phone(210) 492-4200
Fax(210) 492-4280
Emailmrdlux@vfd.com



MicroTurbines can be installed in groups of up to 20 units (100 units with the optional
Capstone PowerServer) to operate as a single power generation source.

MultiPac capability features a single control point and synchronous voltage and frequency output for all units.

Individual MicroTurbines share power and load on both a dynamic and steady state basis.

For Stand Alone mode, the output power from units in the MultiPac is synchronized.
Systems will remain in the Run state with their contactors open until enough units are
available to meet minimum power capabilities, at which time all output contactors close.

If minimum power is not met within MultiPac power time, the units will fault and shutdown,
preventing prolonged operation with fuel and no power output.

Minimum power requirement that must be satisfied before MultiPac Load operation will
commence in Stand Alone mode. Master turbine declares a fault if the minimum time
setting has been exceeded.

Comments

Popular posts from this blog

Loans to Small Bunsinesses Opening Up

CFC Solutions GMBH now MTU Onsite Energy GmbH

TXU and Solar City Partner bring PV Leasing to Texas