RFP Geo thermal Ground Loop (HVAC)

Request for Proposal:
Data Needed
  • Verticle/Horizontal/Manifold
  • Bore Hole Depth
  • Loop Runs
  • Spacing between Cold Hot Loop
  • Bore Hole Size
  • Pipe Size
  • Bore Hole Spacing
  • Packing material
  • Pipe Material
  • Recirculating Pump
  • Maintenance Cycle to incude costs & Freq.
  • Product Replacement Schedule
  • Component Replacement Schedule (10/50%)
  • Warranty Ratio
  • Heat Pump
  • Air Handler
  • Factors:
  • X Sq Ft = 1 Ton of Air
  • I Ton of Air = Dollars Installed
  • System Tonage Capacity

Comments

Popular posts from this blog

Loans to Small Bunsinesses Opening Up

CFC Solutions GMBH now MTU Onsite Energy GmbH

TXU and Solar City Partner bring PV Leasing to Texas